Leo Palace Resort

CBM replaced ground-floor window systems and supplied automatic entrance doors for Leo Palace Resort in Guam—a major resort renovation project improving functional performance and guest experience.

Leo Palace Resort

CBM 文章 - aluminum windows doors 1 - City Building Material Co., Ltd.

Project Details

  • Project

    Leo Palace Resort (Guam)

  • Location

    221 Lake View Drive, Yona, Guam

  • Completed

    2014

  • Type

    Resort Renovation

  • Scope

    Window Replacement + Auto Doors

Project Overview

Material Design Scope

Leo Palace Resort is a large-scale integrated resort development in Guam, originally established by a major Japanese corporation, featuring hospitality, residential, and recreational facilities.

CBM participated in selected renovation and upgrade works, focusing on improving functional performance and user experience within existing structures.

Our scope included the replacement of ground-floor window systems and automatic entrance doors at windbreak vestibules.

Project Photography

On-Site Documentation

Systems Supplied

Technical Specifications

CBM’s involvement in Leo Palace Resort focused on targeted renovation works—replacing aging window systems and supplying integrated automatic door solutions for windbreak vestibules, with the goal of improving building envelope performance and enhancing the guest arrival experience.

Compliance & Testing

Performance Standards

Functional Performance Upgrade

Systems selected and engineered with the specific goal of improving functional performance within the existing resort structure—addressing air tightness, water penetration, and operational reliability.

Coastal Durability


All window and door systems were specified with Guam's marine coastal environment in mind—incorporating corrosion-resistant materials and surface treatments for long-term performance.

Guest Experience Enhancement

Automatic entrance door systems at windbreak vestibules were designed to improve the resort arrival experience—reducing energy loss, improving thermal comfort, and providing seamless access control.

Upgrading Existing Structures for Long-Term Performance

Renovation Focus

Window System Replacement

Complete replacement of existing ground-floor window systems with new aluminum units—engineered for improved air tightness, water penetration resistance, and coastal durability. Designed to match the resort's existing aesthetic while delivering enhanced performance.

Automatic Entrance Doors

Supply and integrated design of automatic entrance door systems for windbreak vestibules—improving energy efficiency, guest comfort, and access control at key resort entry points. Systems coordinated for seamless operation within the existing building envelope.

Let's Work Together

Connect with our engineers to discuss your project specifications.

More Projects

Related Projects